Download Print this page

Arrow Storage Products CG1012 Owner's Manual & Assembly Instructions page 23

Advertisement

Step 10
SO23
The door jambs reinforce the door
opening and provide an attractive
trim. Follow these steps for both
door jambs.
1
Fasten the front wall channels
in their positions between the end of
the side wall channel and the corner
panel using screws. Do not put a
screw in the hole at the end behind
the door opening at this time.
2
Fasten a door jamb to the front
panel with two bolts, nuts and acorn
nuts, as shown.
3
Fasten the center of the door
jamb to the front wall panel and the
front wall channel with two screws.
4
Fasten the top of the door jamb
to the door track with two screws. Do
the same for the bottom into frame.
Repeat steps 2 through 4 for the
opposite door jamb.
Parts Needed For
Front Channel/Door Jamb
9365
STEP
1
STEP
2
Acorn Nut
Hex Nut
9369
Acorn Nut
STEP
4
23
9369 Door Jamb (2)
9365 Front Wall Channel (2)
INSIDE OF
BUILDING
TOP VIEW
(2) bolts
Door Track
9369
Bolt
TOP VIEW
Front Wall Channel
Screw
Screw
STEP
TOP VIEW
Door Track
Screw
Front Wall Channel
Cross-Section
Top View
3
Screw

Advertisement

loading

This manual is also suitable for:

Rmg101262Dw1012euEh1012sDw1012Cg1012 a