Payne PG96VTA Installation, Start-Up, Operating And Service And Maintenance Instructions page 52

Two-stage variable speed ecm 4-way multipoise condensing gas furnace
Table of Contents

Advertisement

1. Attach vent pipe adapter with gasket to furnace casing.
2. Align notches in rubber coupling over standoffs on adapter. Slide clamps over the coupling.
3. Slide vent pipe through adapter and coupling into vent elbow.
4. Insert vent pipe into vent elbow.
5. Torque all clamps 15 lb.- -in.
6. Attach combustion air pipe adapter with gasket to furnace.
7. Attach combustion air pipe to adapter with silicone. Pilot drill a1/8- -in. hole in adapter and secure with a #7 x 1/2- -in. sheet metal
screw.
Attach gaskets to vent pipe and
combustion air adapters.
NOTES FOR VENTING OPTIONS
Fig. 47 - - Vent Coupling and Adapter with Gaskets
TABS ON THE INDUCER OUTLET RESTRICTOR SNAP
INTO THE SLOTS AT THE OUTLET OF THE INDUCER
SEE MAXIMUM EQUIVALENT VENT LENGTH TABLE
(10FT. (3.1 M) OF VENT OR LESS ONLY)
Fig. 48 - - Inducer Vent Elbow
Vent Coupling and Adapter
FOR USAGE:
52
A13074
A170006

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents