Payne PG96VTA Installation, Start-Up, Operating And Service And Maintenance Instructions page 27

Two-stage variable speed ecm 4-way multipoise condensing gas furnace
Table of Contents

Advertisement

PERFORATED
DISCHARGE DUCT
FLANGE
SCREWS (2)
Representative drawing only,
some models may vary in appearance.
1
Lay furnace on the back or side
2
Remove the two (2) screws that secure the bottom
closure panel to the furnace casing and remove the
panel
Fig. 23 - - Removing Bottom Closure Panel (2 Screws)
UPFLOW
90°
YES
YES
120°
MIN
NO
Fig. 22 - - Duct Flanges
BOTTOM
CLOSURE
A170123
27
DOWNFLOW
YES
YES
120°
MIN
NO
SCREWS (4)
BOTTOM
PLATE
Representative drawing only,
some models may vary in appearance.
1
Lay furnace on the back or side
2
Remove the four (4) screws that secure the bottom
plate to the furnace casing
3
Remove the bottom closure from the casing
4
Re--install the bottom plate to the furnace casing and
re--install the four (4) screws
Fig. 24 - - Removing Bottom Closure Panel (4 Screws)
HORIZONTAL
90°
YES
YES
120°
MIN
NO
A10493
A170124

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents