P-K Mach C1500Gg & C2000Gg; Natural Gas Train And Propane Gas Train Locations - Patterson-Kelley MACH C-1500H Installation & Owner's Manual

Gas fired boilers w/ nuro control system
Table of Contents

Advertisement

P-K MACH C1500GG & C2000GG

4.3.1 Natural Gas Train and Propane Gas Train Locations

The dual fuel MACH C1500GG & C2000GG feature two 1-1/2" gas valves/cocks on the rear surface as
shown below:
CLOSED. If operating with Propane Gas, ensure the Natural Gas valve/cock is CLOSED. Failure to
do so could result in equipment damage, injury, and/or death.
Revised: January 3, 2020
Released: January 3, 2020
If operating with Natural Gas, ensure the Propane Gas valve/cock is
 Patterson-Kelley 2020
All Rights Reserved.
®
P-K MACH
Technical Service 1.877.728.5351
1-1/2" NPT-F
Propane Gas
1-1/2" NPT-F
Natural Gas
1004905981 P-K MACH C1500H-C4000 Installation and
Owners Manual (Rev F Jan-2020).docx
Gas Fired Boiler
Page 52