Installation; Introduction; Unpacking - Henny Penny Wendy's MPC-21L Operator's Manual

Multipurpose pass-thru holding cabinet
Table of Contents

Advertisement

2-1.

INTRODUCTION

MPC-21L = 25 lbs, MPC-222 = 45 lbs
2-2.

UNPACkING

Sept. 2013
SECTION 2: INSTALLATION
This section provides the installation instructions for the Henny
Penny Multipurpose Holding Cabinet.
The Henny Penny Multipurpose Holding Cabinet has been
tested, inspected, and expertly packed to ensure arrival at its
destination in the best possible condition. The cabinet rests on
cardboard pads that sit on a wooden skid. The unit is then packed
inside a heavy cardboard carton with sufficient padding to
withstand normal shipping treatment.
To remove the Henny Penny Multipurpose Holding Cabinet
from the carton, you should:
1.
2.
3.
4.
5.
4
Installation of this unit should be performed only by a
qualified service technician.
Do not puncture the unit with any objects such as
drills or screws as electrical shock or component
damage could result.
Any shipping damage should be noted in the presence
of the delivery agent and signed prior to his or her
departure.
Carefully cut banding straps.
Lift the carton off the unit.
Lift the unit off the cardboard padding and skid.
Peel off any protective covering from the exterior of the cabinet.
The unit is now ready for location and set up.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wendy's mpc-222

Table of Contents