Step 5 - Field Fabricate Ductwork; Units With Accessory Or Optional Electric; Heaters; Step 6 - Rig And Place Unit - Carrier WeatherExpert 50LC14 Installation Instructions Manual

Single package rooftop cooling only with puron(r-410a) refrigerant
Table of Contents

Advertisement

Step 5 — Field Fabricate Ductwork
Cabinet return-air static pressure (a negative condition) shall
not exceed 0.35 in. wg (87 Pa) with economizer or without
economizer.
For vertical ducted applications, secure all ducts to roof curb and
building structure. Do not connect ductwork to unit.
Fabricate supply ductwork so that the cross sectional dimensions
are equal to or greater than the unit supply duct opening dimen-
sions for the first 18-in. (458 mm) of duct length from the unit
basepan.
Insulate and weatherproof all external ductwork, joints, and roof
openings with counter flashing and mastic in accordance with ap-
plicable codes.
Ducts passing through unconditioned spaces must be insulated
and covered with a vapor barrier.
If a plenum return is used on a vertical unit, the return should be
ducted through the roof deck to comply with applicable fire codes.
WARNING
PERSONAL INJURY HAZARD
Failure to follow this warning could cause personal injury.
For vertical supply and return units, tools or parts could drop
into ductwork and cause an injury. Install a 90 degree turn in
the return ductwork between the unit and the conditioned
space. If a 90 degree elbow cannot be installed, then a grille of
sufficient strength and density should be installed to prevent
objects from falling into the conditioned space. Due to electric
heater, supply duct will require 90 degree elbow.
"B"
UNIT
50LC-*14
50LC-*17
50LC-*20
50LC-*24
50LC-*26
NOTES:
1. Dimensions in ( ) are in millimeters.
2. Hook rigging shackles through holes in base rail, as shown in detail "A." Holes in base rails are centered around the unit center of
gravity. Use wooden top to prevent rigging straps from damaging unit.
36"-54"
(914-1371)
SEE DETAIL A
"C"
"A"
MAX WEIGHT
LB
KG
IN.
2004
911
127.8
2246
1021
141.5
2353
1069
141.5
2499
1136
157.8
2643
1201
157.8
Fig. 22 — Rigging Details
PROPERTY DAMAGE HAZARD
Failure to follow this caution may result in damage to roofing
materials.
Membrane roofs can be cut by sharp sheet metal edges. Be
careful when placing any sheet metal parts on such roof.

UNITS WITH ACCESSORY OR OPTIONAL ELECTRIC

HEATERS

Minimum clearance is not required around ductwork.
Step 6 — Rig and Place Unit
UNIT DAMAGE HAZARD
Failure to follow this caution may result in equipment damage.
All panels must be in place when rigging. Unit is not designed
for handling by fork truck when packaging is removed.
If using top crate as spreader bar, once unit is set, carefully
lower wooden crate off building roof top to ground. Ensure
that no people or obstructions are below prior to lowering the
crate.
Keep unit upright and do not drop. Spreader bars are not required
if top crating is left on unit. Rollers may be used to move unit
across a roof. Level by using unit frame as a reference. See Table 2
on page 19 and Fig. 22 for additional information.
Lifting holes are provided in base rails as shown in Fig. 22. Refer
to rigging instructions on unit.
Before setting the unit onto the curb, recheck gasketing on curb.
PLACE ALL SEAL STRIP
IN PLACE BEFORE PLACING
UNIT ON ROOF CURB.
DUCT END
DIMENSIONS
A
B
MM
IN.
3249
59.1
3595
65.5
3595
65.5
4007
72.8
4007
72.8
24
CAUTION
CAUTION
DETAIL A
C
MM
IN.
MM
1501
52.3
1328
1664
60.3
1532
1664
60.3
1532
1849
60.3
1532
1849
60.3
1532

Advertisement

Table of Contents
loading

This manual is also suitable for:

Weatherexpert 50lc26

Table of Contents