Step 5 - Field Fabricate Ductwork; Step 6 - Rig And Place Unit - Carrier 50TCQD Installation Instructions Manual

Single package rooftop with puron (r-410a) refrigerant sizes 17 & 24
Hide thumbs Also See for 50TCQD:
Table of Contents

Advertisement

A
B
Fig. 6 - - Unit Leveling Tolerances
Control Box
Access Panel
Filter and
Indoor Coil
Access Panel
Indoor Blower
Access Panel
Electric Heat
Access Panel
Fig. 7 - - Typical Access Panel and Compressor Locations
Step 5 — Field Fabricate Ductwork
Cabinet return-air static pressure (a negative condition)
shall not exceed 0.5 in. wg (87 Pa) with economizer or
without economizer.
For vertical ducted applications, secure all ducts to roof curb
and building structure. Do not connect ductwork to unit.
Insulate and weatherproof all external ductwork, joints,
and roof openings with counter flashing and mastic in
accordance with applicable codes.
Ducts passing through unconditioned spaces must be
insulated and covered with a vapor barrier.
If a plenum return is used on a vertical unit, the return
should be ducted through the roof deck to comply with
applicable fire codes.
For units with accessory electric heaters, minimum clearance
is not required around ductwork. One inch (25 mm)
clearance to combustible materials must be maintained for
the first 48 inches (1220 mm) of ductwork exiting the unit.
This applies to horizontal and vertical applications.
Outlet grilles must not lie directly below unit discharge.
NOTE:
A 90- - degree elbow must be provided in the
ductwork to comply with UL (Underwriters Laboratories)
code for use with electric heat.
C
MAXIMUM ALLOWABLE
DIFFERENCE IN. (MM)
A-B
B-C
A-C
0.25" (6)
0.5" (12)
0.5" (12)
C09132
Compressor
(each side)
C09118
WARNING
!
PERSONAL INJURY HAZARD
Failure to follow this warning could cause personal
injury.
For vertical supply and return units, tools or parts
could drop into ductwork and cause an injury. Install
a 90- - degree turn in the return ductwork between the
unit and the conditioned space. If a 90- - degree elbow
cannot be installed, then a grille of sufficient strength
and density should be installed to prevent objects
from falling into the
electric heater, supply duct will require 90- - degree
elbow.
Step 6 — Rig and Place Unit
Keep unit upright and do not drop. Spreader bars are not
required if top crating is left on unit. Rollers may be used
to move unit across a roof. Level by using unit frame as a
reference. See Table 1 (on page 7) and Fig. 8 for additional
information.
Lifting holes are provided in base rails as shown in Fig. 8.
Refer to rigging instructions on unit.
CAUTION
!
UNIT DAMAGE HAZARD
Failure to follow this caution may result in
equipment damage.
All panels must be in place when rigging. Unit is not
designed for handling by fork truck.
Before setting the unit onto the curb, recheck gasketing on
curb.
Positioning on Curb —
Position unit on roof curb so that the following clearances
1
are maintained:
/
in. (6 mm) clearance between the roof
4
curb and the base rail inside the right and left,
(12 mm) clearance between the roof curb and the base rail
inside the front and back. This will result in the distance
between the roof curb and the base rail inside on the
condenser end of the unit being approximately equal to
Detail A in Figs. 4 and 5.
Do not attempt to slide unit on curb after unit is set. Doing
so will result in damage to the roof curb seal.
Although unit is weatherproof, guard against water from
higher level runoff and overhangs.
After unit is in position, remove rigging skids and
shipping materials.