Through An Existing Masonry Chimney - Drolet ECO-55 Installation Manual

Hide thumbs Also See for ECO-55:
Table of Contents

Advertisement

Available languages

Available languages

4.6.5
THROUGH AN EXISTING MASONRY
CHIMNEY
1. Position stove following clearances following vent
2. Mark the center of the hole where the vent pipe
manufacturer's instructions.
3. It is necessary to make a hole in the masonry
will go through the masonry chimney.
with a one-inch diameter greater than the diame-
4. Install the cleanout tee at the bottom of the ver-
ter of the vent pipe used.
tical vent system and lower it down the chimney
until the center branch of the tee is aligned with
5. Connect the horizontal vent pipe to the cleanout
the hole in the masonry.
6. If desired, once the horizontal pipe is in place,
tee by pushing it through the hole in the masonry.
the space between the pipe and masonry may be
7. Install a vented flashing at the top of the mason-
filled with high-temperature grout.
ry chimney. Stainless steel plate and screws are
recommended. Cut a hole for the vent pipe. If
needed, cut a second hole for the air intake pipe.
Seal all joints with high temperature waterproof
8. Install and seal flashing with high temperature
silicone sealant to prevent water leakage.
9. Seal and install vertical roof vent. If required, seal
waterproof silicone sealant.
10. If desired, install a trim collar and use an addi-
and install a storm collar.
tional horizontal vent pipe length, if required, to
connect the stove to the chimney.
Page 14
5.
INSTALLING
HOPPER EXTENSION
To increase the hopper capacity, it is possible to
install a hopper extension, sold separatly. Consult
your dealer or website for details.
INSTALLATION MANUAL ECO-55 / ECO-55 CT / ECO-55 ST
THE
OPTIONAL

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eco-55 ctEco-55 stDp00070Dp00072Dp00071

Table of Contents