Carrier WeatherExpert 50LC 07 Series Installation Instructions Manual page 10

Single package rooftop cooling only with r-410a refrigerant
Table of Contents

Advertisement

TOUS LES CAPOTS DOIVENT ÊTRE EN PLACE AVANT LE LEVAGE
• Hook rigging shackles through holes in base rail, as shown in Detail "A".
• Use wooden top skid, when rigging, to prevent rigging straps from damaging unit.
• Max weight includes base unit plus shipping pallet plus all available FIOP's which
could be on that size unit.
• "B" dimension is based on base unit plus economizer option only. This
dimension may vary slightly with units configured with other FIOP options.
• Spreader bars required to lift and transport the unit.
• Accrocher les manilles des élingues de levages dans les trous situés dans le rail
de base comme indiqué au Détail "A".
• Utiliser des cales en bois lors du levage pour éviter que les élingues
n'endommagent le haut de l'appareil.
• Le poids maximum inclut la configuration de base, le poids de la palette
d'expédition, ainsi que toutes les options pouvant être installées en usine (FIOP)
pour la plateforme sélectionnée.
• La dimension de "B" provient de la configuration de base qui inclut l'option
economizer seulement, Cette dimension peut varier légèrement en fonction
des différentes options sélectionnées installées en usine (FIOP).
• Barres d'écartement requises pour soulever et transporter l'unité.
REQUIRED
SPREADER
BARS
Step 7 — Convert to Horizontal and Connect
Ductwork (when required)
Unit is shipped in the vertical duct configuration. Unit without
factory-installed economizer or return-air smoke detector op-
tion may be field-converted to horizontal ducted configuration.
To convert to horizontal configuration, remove screws from
side duct opening covers (see Fig. 7) and remove covers. Use
the screws to install the covers on vertical duct openings with
the insulation-side down. The panels must be inserted into the
notches on the basepan to properly seal. The notches are cov-
ered by the tape used to secure the insulation to the basepan
and are not easily seen. See Fig. 8 for position of the notches in
the basepan. Seals around duct openings must be tight. Secure
with screws as shown in Fig. 9. Cover seams with foil duct
tape.
Field-supplied flanges should be attached to horizontal duct
openings and all ductwork should be secured to the flanges. In-
sulate and weatherproof all external ductwork, joints, and roof
or building openings with counter flashing and mastic in accor-
dance with applicable codes.
Do not cover or obscure visibility to the unit's informative data
plate when insulating horizontal ductwork.
CAUTION - NOTICE TO RIGGERS:
AVERTISSEMENT - REMARQUE À
L'ATTENTION DES MONTEURS
ALL PANELS MUST BE IN PLACE WHEN RIGGING.
PLACE ALL SEAL STRIP IN PLACE
BEFORE PLACING UNIT ON ROOF CURB.
"B"
INSTALLER TOUTES LES BANDES
914-1371
D'ISOLATION EN PLACE AVANT DE
(36"-54")
PLACER L'APPAREIL SUR LE REBORD
DE TOIT.
"C"
"A"
SEE DETAIL "A"
VOIR DÉTAIL "A"
MAX WEIGHT
MODEL
48LC_007
1145
50LC_007
1080
Fig. 6 — Rigging Label
DUCT END
PASSAGES CONDUITES
A
LB
KG
IN
MM
520
88
2235
491
88
2235
REMOVABLE HORIZONTAL
RETURN DUCT OPENING COVER
Fig. 7 — Horizontal Conversion Panels
10
DETAIL A
DÉTAIL "A"
B
C
IN
MM
IN
MM
32
812
49 1/2
1257
30 3/8
772
49 1/2
1257
48TM504503 REV -
REMOVABLE HORIZONTAL
SUPPLY DUCT OPENING COVER

Advertisement

Table of Contents
loading

Table of Contents