Installing The Handle; Installing The Starter Rope; Installing The Fuel Tank And The Fuel Line - Toro ProLine Recycler 22038 Operator's Manual

53 cm walk power lawn mower
Hide thumbs Also See for ProLine Recycler 22038:
Table of Contents

Advertisement

Installing the Handle

1. Mount the handle to the outside of the lawn mower
housing (using the bottom hole) with 2 bolts (5/16–18
x 1–1/4 in.), washers, and thin nylon insert locknuts.
2. Secure the handle latches to the handle with 2 bolts
(5/16–18 x 1-1/2 in.), washers, and nylon insert
locknuts (Fig. 2).
5
6
7
Figure 2
1. Cable ties
2. Bag support rod
3. Cap locknut (2)
4. Handle
5. Bolt, 5/16–18x1-1/4 in. (2)
6. Handle latch (2)
Note: You can adjust the handle height for comfortable
operation. Stand behind the handle to determine the
height. To adjust the handle height, position the bolts and
the locknuts that secure the handle latches to the handle
into the other mounting holes in the latches.
3. Slide the bag support rod through the top mounting
holes in the handle and secure each end with a cap
locknut (Fig. 2).
4. Use cable ties to secure the control cables to the
handle.
2
1
3
4
8
9
10
534
7. Thin nylon insert
locknut (2)
8. Locknut (2)
9. Washer (4)
10. Bolt, 5/16–18x1-1/2 in. (2)

Installing the Starter Rope

Pull the starter rope through the rope guide on the handle
(Fig. 3).
1
Figure 3
1. Starter rope
Note: To make the rope easier to install, squeeze the
control bar on the handle.
Installing the Fuel Tank and the
Fuel Line
1. Start the 2 self-tapping screws into the bottom of the
fuel tank and then remove the screws (Fig. 4).
Figure 4
1. Locknut
2. Fuel tank retainer
3. Plastic clips
4. Fuel tank
2. Hook the plastic clips on the front of the fuel tank onto
the fuel tank bracket (Fig. 4).
3. Secure the fuel tank to the tank base with the 2
self-tapping screws (Fig. 4). Do not overtighten the
screws.
7
2
m–210
2. Rope guide
m-2942
5. Fuel tank bracket
6. Tank base
7. Self-tapping screws

Advertisement

Table of Contents
loading

Table of Contents