Verifying A Repair - IBM Power Systems 9008-22L Manual

Front usb cable
Hide thumbs Also See for Power Systems 9008-22L:
Table of Contents

Advertisement

b. After viewing the comments, click Close.
c. Click Actions > View Service History. The Service History window opens, showing service
history that is associated with the selected error.
d. After viewing the service history, click Close.
5. Click Cancel twice to close the Serviceable Event Details window and the Serviceable Event Overview
window.

Verifying a repair

Use these procedures to verify hardware operation after making repairs to the system.
Choose from the following options:
v To verify the repair of a system that is currently powered off, go to step 1.
v To verify the repair of a system that is currently powered on with no operating system loaded, go to
step 3.
v To verify the repair of a system that is currently powered on and that has an operating system loaded,
go to step 5 on page 49.
1.
Power on the server and all attached I/O enclosures.
Did all the enclosures power on?
Yes: Go to step 3.
No: Continue with the next step.
2.
Choose from the following options:
v If the original problem was that an enclosure would not power on and you have another FRU to replace, locate
and replace the next field-replaceable unit (FRU).
v If the next FRU in the FRU list is an isolation procedure, perform the isolation procedure.
v If the original problem was that an enclosure would not power on and you have an isolation procedure to
complete, perform the isolation procedure.
v If the original problem was that an enclosure would not power on and there are no more FRUs or isolation
procedures in the FRU list, contact your next level of support.
v If you have a new problem, perform problem analysis and repair the new problem.
3. Load the operating system.
Did the operating system load successfully?
Yes: Go to step 5.
No: Continue with the next step.
4.
Choose from the following options:
48
Front USB cable

Advertisement

Table of Contents
loading

This manual is also suitable for:

Power systems 9009-22aPower systems 9223-22h

Table of Contents