Verifying The Installed Part By Using The Hmc - IBM Power Systems 9008-22L Manual

Front usb cable
Hide thumbs Also See for Power Systems 9008-22L:
Table of Contents

Advertisement

steps to update the error log to indicate that a system-detectable part has been replaced. On systems
with a indicator light for the failing part, this changes the indicator light to the normal state.
a. Select the resource that has been replaced from the Resource Repair Action menu. If the repair
action was reseating a cable or adapter, select the resource associated with that repair action. If
the resource associated with your action does not appear in the Resource List, select sysplanar0.
Press Enter.
b. Select Commit after you make your selections. Did another Resource Repair Action display
appear?
v No: If the No Trouble Found display appears, go to step 9.
v Yes: Go to step 8.
8. Select the parent or child of the resource for the replaced part from the Resource Repair Action
menu if necessary. When a test is run on a resource in system verification mode, and that resource
has an entry in the error log, if the test on the resource was successful, the Resource Repair Action
menu appears. Complete the following steps to update the error log to indicate that a
system-detectable part has been replaced. This changes the indicator light for the part from the fault
state to the normal state.
a. From the Resource Repair Action menu, select the parent or child of the resource that has been
replaced. If the repair action was to reseat a cable or adapter, select the resource associated with
that repair action. If the resource associated with your action does not appear in the Resource
List, select sysplanar0. Press Enter.
b. Select Commit after you make your selections.
a. If the No Trouble Found display appears, go to step 9.
9. If you changed the service processor or network settings, as instructed in previous procedures,
restore the settings to the values they had prior to servicing the system.
10. Did you perform any hot-plug procedures before doing this procedure?
v No: Go to step 11.
v Yes: Go to step 12.
11. Start the operating system, with the system or logical partition in normal mode. Were you able to
start the operating system?
v No: Contact your service provider. This ends the procedure.
v Yes: Go to step 12.
12. Are the indicator lights still on?
v No: This ends the procedure.
v Yes. Turn off the lights. For instructions, see Changing service indicators.

Verifying the installed part by using the HMC

If you have installed or replaced a part, use the Hardware Management Console (HMC) to update your
HMC records after you have completed a service action on your server. If you have reference codes,
symptoms, or location codes that you used during the service action, locate the records for use during
this procedure.
Procedure
1. At the HMC, examine the service action event log for any open service action events. See "Viewing
serviceable events by using the HMC" on page 47 for details.
2. Are there any service action events that are open?
No: If the system attention LED is still on, use the HMC to turn off the LED. See "Deactivating
LEDs by using the HMC" on page 67. This ends the procedure.
Yes: Continue with the next step.
3. Record the list of open service action events.
46
Front USB cable

Advertisement

Table of Contents
loading

This manual is also suitable for:

Power systems 9009-22aPower systems 9223-22h

Table of Contents