Download Print this page

Daikin FT15HV2S Service Manual page 14

4.2/5.0/6.0/7.1/8.0/9.0 kw class 15000 btu/h class removal procedure

Advertisement

Removal of Electrical Box / PCBs / Swing Motors
Step
Press the signal
3
receiver unit down and
unfasten the hooks on
the upper side, and
then unfasten the hooks
on the lower side.
4
Cut the clamp.
The signal receiver unit
5
has 4 PCBs.
Unfasten the hooks and
remove each PCB.
Disconnect every
connector from each
PCB.
Cut the clamp.
6
12
Procedure
Signal receiver unit
Signal receiver PCB
Display PCB
Buzzer PCB
INTELLIGENT EYE
sensor PCB
(R12895)
(R17177)
Remove the signal receiver
unit while pushing the hooks
of connectors.
Some models have no
INTELLIGENT EYE sensor
PCB.
(R2783)
(R15508)
Si04-855
Points
Removal Procedure

Advertisement

loading