Orientation - Carrier 58SP0A Installation, Start-Up, Operating And Service And Maintenance Instructions

Hide thumbs Also See for 58SP0A:
Table of Contents

Advertisement

58SP0A/58SP1A: Installation, Start–Up, Operating and Service and Maintenance Instructions
4. Use a hammer and screwdriver to strike a sharp blow between the
tie points and work the slug back and forth until the slug breaks
free.
An accessory Vent Guard Kit is REQUIRED for downflow applications
for use where the vent exits through the lower portion of the furnace
casing. Refer to the Vent Guard Kit Instructions for complete details. See
Product Data Sheet for accessory listing.
The horizontal portion of the venting system shall slope upwards not less
than 1/4-in. per linear ft. (21 mm/m) from the furnace to the vent and
Caution!! For the following applications, use the minimum vertical heights as specified below.
For all other applications, follow exclusively the National Fuel Gas Code.
FURNACE

ORIENTATION

Downflow
Downflow
Downflow
NOTE: All vent configurations must also meet National Fuel Gas Code venting requirements NFGC.
*4-in. (102 mm) inside casing or vent guard
**Including 4 in. (102 mm) vent section(s)
SEE NOTES: 1,2,4,7,8,9
on the page following
these figures
Fig. 30 – Upflow Application - Vent Elbow Up
Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.
Table 8 – Recommended Minimum Vent Height Per Furnace and Vent Orientation
VENT ORIENTATION
Vent elbow up then left
Fig. 32
Vent elbow left, then up
Fig. 34
Vent elbow up, then right
Fig. 35
shall be rigidly supported every 5 ft. (1.5 M) or less with metal hangers
or straps to ensure there is no movement after installation.
Sidewall Venting
This furnace is not approved for direct sidewall horizontal venting.
Per section 12.4.3 of the NFPA 54/ANSI Z223.1, any listed mechanical
venter may be used, when approved by the authority having jurisdiction.
Select the listed mechanical venter to match the BTUh input of the
furnace
being
vented.
requirements for venting and termination included with the listed
mechanical venter.
FURNACE INPUT
(BTUH/HR)
110,000
110,000
110,000
SEE NOTES: 1,2,3,4,7,8,9
on the pages following
these figures
A03208
Fig. 31 – Upflow Application - Vent Elbow Right
22
Follow
all
manufacturer's
MIN. VENT
MIN. VERTICAL VENT
DIAMETER
HEIGHT
IN. (mm)*
FT. (M)**
5 (127)
5 (127)
5 (127)
installation
10 (3.0)
12 (3.6)
10 (3.0)
A03209

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

58sp1a

Table of Contents