Removing The Sub Board Switch - Fujitsu CELSIUS H7510 Manual

Hide thumbs Also See for CELSIUS H7510:
Table of Contents

Advertisement

Removing the sub board switch

Required work steps:
Removing the battery
Removing the service door
Removing the fan
Removing the 2.5" HDD
Removing the LTE module
Removing the WLAN module
Removing the lower assy
Removing the M.2 module under the service door
Removing the mains connection
Removing the mainboard
Page 36 of 52
Required tools:
Screwdriver: Phillips PH00

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents