Inserting The M.2 Module Under The Service Door - Fujitsu CELSIUS H7510 Manual

Hide thumbs Also See for CELSIUS H7510:
Table of Contents

Advertisement

Inserting the M.2 module under the service door

Required work steps:
Removing the battery
Removing the service door
Insert the M.2 module into the socket in the direction indicated by the yellow arrow and carefully press it on the other side.
Observe the coding.
Fix the M.2 module with an M2XL3 screw (yellow circle).
Return to Table of Contents
Page 13 of 52
Required tools:
Screwdriver: Phillips PH00

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents