Ultra Low Nox Gas Furnace Option - Component Layout; Condensate Drain Configuration - Trane Precedent YZC036E Installation, Operation And Maintenance Manual

Packaged rooftop air conditioners with eflex technology, gas/electric
Table of Contents

Advertisement

Ultra Low NOx Gas Furnace Option -
Component Layout
F
Figure 60. NOx gas burner component layout
Flame rollout switch
NOx
burner box
Note: Illustration is shown without Gas Heat Access Door and Right Center Post.
Notes:
The NOx burner assembly is factory set for optimum
performance and should only be adjusted or modified
by a qualified technician.
The burner box and premix/blower valve are mated
parts - if either part needs replaced the complete
assembly will need to be replaced.
The low temperature cutoff switch is intended to
prevent gas heat operation below 32°F due to low
operating temperature limitations with the premix
blower component.
The NOx gas furnace option not available for high
altitude installations above 2000 ft.

Condensate Drain Configuration

WARNING
Hazardous Voltage!
Failure to disconnect power before servicing could
result in death or serious injury. Disconnect all electric
power, including remote disconnects before servicing.
Follow proper lockout/tagout procedures to ensure the
power can not be inadvertently energized.
An evaporator condensate drain connection is provided
on each unit. Refer to
Figure 38, p. 24
for the appropriate drain location.
RT-SVX46G-EN
Flame sensor (shown for 90k furnace)
Premix
Spark
Gas valve
blower
electrode
and
Figure 39, p. 24
Inducer motor
Pressure switch
E box 24V
for gas valve
Low temperature
ambient cutoff
switch
Field connection
- 1/2" npt(f)
The condensate drain pan is factory installed to drain
condensate to the back side of the unit. See
p. 24
and
Figure 39, p.
24. It can be converted to drain
condensate out the front side of the unit or through-the-
base.
To convert drain condensate out the front of unit:
1. Remove evaporator access panel and supply air access
panels.
2. Remove the support panel that the condensate drain
pan exits through.
3. Slide the condensate drain pan out of the unit and
rotate 180°.
4. Slide the condensate drain pan back into the unit, align
the drain with the grommeted opening in the rear
support panel and push until the coupling is seated in
the grommet.
5. Replace the front support panel by aligning the panel
with tabs in the raceway. Align the condensate drain
pan support in the grommeted hole as the panel is put
in place.
6. Replace evaporator access panel and supply air access
panels.
To convert drain condensate through-the-base of unit:
1. Remove evaporator access panel and supply air access
panels.
Installation
Figure 38,
33

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents