Siemens Wallace & Tiernan Chem-Ad VPP Instruction Manual page 64

Peristaltic metering pumps
Table of Contents

Advertisement

Available languages

Available languages

4.
Installation
A
Guides
64
Chem-Ad
Procedure:
1 Strip the cables (if not already pre-wired), remove the
insulation and fit multicore cable ends.
2 Insert the cables through the cable glands.
3 Place the cables (or the individual wire) along the side of the
wall case in the guides and lay the cables so that they do not
touch the motor (the motor can heat up considerably during
continuous operation and the cables could be damaged). The
A
motor position is marked by the round indentation in the wall
case.
4 Wire terminals in the wall case (see chapter 7.).
®
5 Chem-Ad
VPP-E only:
If a suction lance will not be connected, bridge terminals 11/12.
®
6 Chem-Ad
VPP-E only:
In operating mode 1, bridge terminals 13/14 if an external
release is not present.
7 Tighten the union nuts on the cable glands.
Warning!
The pump only meets IP65 specifications when the cable gland is
tight.
Please note
Note the maximum load of the voltage-free output relay contact in
®
Chem-Ad
VPP-E:
Ohmic load:
AC 250 V, max. 2 A
Inductive load: AC 250 V, max. 1 A
®
VPP / VPP-E / VPP-DC
WT.490.250.000.DM.IM.0911

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents