Download Print this page

Daikin RK18NMVJU Service Manual page 10

Hide thumbs Also See for RK18NMVJU:

Advertisement

Electrical Box
Step
5
Disconnect the
connector [S80] and
pull out the clamp (Hole
No.1).
6
Disconnect the
connector [S20] and
pull out the clamp (Hole
No.11).
7
Pull out the clamp (Hole
No.16) and disconnect
the connector [S40].
8
Pull out the clamp (Hole
No.2).
8
Procedure
[S80]
Clamp
[S20]
[S40]
Clamp
Points
[S80]: four way valve coil
 The cooling only models
have no harness for [S80].
 When reassembling,
connect the connectors in
the following order. Be sure
to insert the wiring clamps of
lead wires into the
appropriate holes.
(1) [S90]: Hole No.15, 14,
13, 7, 3
(2) [S40]: Hole No.16, 2
(3) [S20]: Hole No.11
(4) [S80]: Hole No.1
(R21967)
Hole No. for wiring clamps
17
16
15
1
3
5
2
4
6
[S20]: electronic expansion
valve coil
Clamp
(R21968)
[S40]: overload protector
Clamp
Removal Procedure
Si001555EC
14
13
7
9
11
8 10 12
(R21996)
(R21998)

Advertisement

loading