Prepare The Site - Kohler K-11344 Installation And Care Manual

Bath with airjets
Hide thumbs Also See for K-11344:
Table of Contents

Advertisement

Available languages

Available languages

Bond in accordance
with applicable codes.

1. Prepare the Site

NOTICE: Measure your product for site preparation. Note the model number located on the
pump/blower end of the bath, then visit the product page at www.kohler.com for more information.
Install an access panel to service the blower motor.
Prepare the routing paths for the PVC piping and keypad cable. Follow all applicable building, fire,
plumbing, and electrical codes.
Carefully unpack and inspect the new bath for damage before installation. If there is damage do not
install the bath; contact your dealer.
Make sure the flooring offers adequate support for the bath, and verify that the subfloor is flat and
level.
Install the rough plumbing.
Determine the location of the bath. Provide a minimum clearance of 24" (610 mm) around the
perimeter of the bath.
IMPORTANT! To ensure a successful installation, it is critical that the bath be installed on a perfectly
level finished floor.
Apply the finished flooring material prior to installing the bath.
Confirm the finished floor is perfectly level before proceeding with the bath installation.
Kohler Co.
24" (610 mm) Max. Distance
Between Blower and Outlet
Air Intake
Install a GFCI-protected
120 V, 15 A grounded outlet.
5
1220597-2-A

Advertisement

Table of Contents
loading

This manual is also suitable for:

K-14037

Table of Contents