Wiring - SMC Networks ISA3 Series Operation Manual

Digital gap checker pressure switch
Hide thumbs Also See for ISA3 Series:
Table of Contents

Advertisement

■Wiring

○Mounting and removal of connector
Tighten the connector by hand.
Align the body connector key and the cable connector key groove to insert vertically.
Turn the knurled part of the cable side connector clockwise.
Connection is complete when the knurled part is fully tightened. Check that the connection is not loose.
○Connector pin No. (Body side)
Connector pin No.
Description
1
DC(+)
2
OUT2
3
DC(-)
4
OUT1(C/Q)
-36-
3
Installation
No.PS※※-OMW0009-A

Advertisement

Table of Contents
loading

This manual is also suitable for:

Isa3-fIsa3-gIsa3-h

Table of Contents