To Install The Discharge Grille; Opening And Closing The Unit; About Opening The Units - Daikin Altherma 3 M Installer's Reference Manual

Hide thumbs Also See for Altherma 3 M:
Table of Contents

Advertisement

7.2.6 To install the discharge grille

7.3 Opening and closing the unit

7.3.1 About opening the units

EBLA09~16DA + EDLA09~16DA
Daikin Altherma 3 M
4P620241-1 – 2020.06
a
2 Remove the burrs, and paint the edges and areas around the edges using
repair paint to prevent rusting.
NOTICE
When making knockout holes, do NOT damage the casing and underlying piping.
1 Insert the hooks. To prevent breaking the hooks:
▪ First insert the bottom hooks (2×).
▪ Then insert the top hooks (2×).
2 Insert and fix the screws (4×)(delivered as accessory).
1
2
4 N • m
T25
At certain times, you have to open the unit. Example:
When connecting the electrical wiring
When maintaining or servicing the unit
7
Unit installation
|
2
1
Installer reference guide
71

Advertisement

Table of Contents
loading

Table of Contents