Operation; Before You Begin; Powering On/Powering Off - Seagate Exos AP 4U100 Installation And Maintenance Manual

Table of Contents

Advertisement

4

Operation

Before you begin

Before powering ON the enclosure system, make sure that all modules are firmly seated in their correct slots. Verify that
you have successfully completed the sequential "Installation Checklist" instructions in
completed these steps, you can access the management interfaces to complete the system setup.

Powering ON/powering OFF

CAUTION: Do not operate the enclosure system until the ambient temperature is within the specified operating range
described in
"Environmental requirements" (page
have had time to adjust to the environmental conditions before they are used with production data for I/O.
Power ON the enclosure by connecting the power cables from the PSU to the PDU. See
System Power LED on the front panel should be lit green when the enclosure power is activated.
Power OFF the system by disconnecting the power cord from the power supply module.
When powering ON, make sure to power up the enclosures and associated data host in the following order:
1. Expansion enclosures (Exos E 4U106) first
This ensures that the disks in the expansion enclosures have enough time to completely spin up before being
scanned by the Controller modules within the server enclosure (Exos AP 4U100).
While enclosures are getting powered ON, their LEDs blink. After the LEDs stop blinking—if no LEDs on the front,
back and top of the enclosure are amber—the power ON sequence is complete, and no faults have been detected.
a. See
"Overview of front panel LEDs"
b. See
"Overview of rear panel LEDs" (page 33)
c. See
"Overview of top LEDs" (page 38)
2. Controller enclosure next.
Depending upon the number and type of disks in the system, it may take several minutes for the system to become
ready.
Depending upon system configuration, when power is applied to the 4U100 enclosure, the Controller modules will
either boot to standby or move to full operation. To transit from standby to operation, you can use "Reset" button or
use IPMI. For more information consult with your Integration partner.
3. Data host last (if powered OFF for maintenance purposes).
When powering OFF, you will reverse the order of steps used for powering ON.
IMPORTANT: If main power is lost for any reason, upon restoration of power, the system will restart automatically.
NOTE: Refer
80
Operation
"Front panel LEDs" (page 82)
113). If the drive modules have been recently installed, make sure they
and
Figure 15
on
page
32.
and figures/tables for rear panel CRUs.
and figures/tables for top panel CRUs.
for details pertaining to front panel LEDs and related fault conditions.
Table 4 (page
45). Once you have
Figure 68 (page
79). The

Advertisement

Table of Contents
loading

Table of Contents