Testing The Water System - Navien NCB-190/060H Installation & Operation Manual

Condensing combi-boilers
Hide thumbs Also See for NCB-190/060H:
Table of Contents

Advertisement

3.4.2 External Water Fill Connection
External water fill connection may be installed
on the system piping if it is required for specific
applications. See the following figure for an example
of external water fill installation on the system
piping.
Pressure Relief
Valve
Air Separator
Pump
To System
Make-up
Water
Expansion Tank
30
Installing the System Piping

3.5 Testing the Water System

WARNING
Ensure that the boiler is full of water before
firing the burner. Operating the unit without
completely filling it will damage the boiler. Such
damage is not covered by the warranty, and
may result in property damage, severe personal
injury, or death.
Perform a fill test after installing the boiler's water
system to make sure that the system has been
installed properly. Follow the instructions below to
perform a fill test on the water system.
1. Fill the system only after ensuring that the water
chemistry meets the requirements.
Contaminant
Total Hardness
Aluminum
From
Chloride
System
Copper
Iron
Manganese
pH
Sulfate
Total Dissolved
Solids (TDS)
Zinc
Chlorine
Note
Maximum Allowable Level
Up to 200 mg/l
(12 grains/gallon)
0.05 to 0.2 mg/l
Up to 250 mg/l
Up to 1.0 mg/l
Up to 0.3 mg/l
Up to 0.05 mg/l
6.5 to 8.5
Up to 205 mg/l
Up to 500 mg/l
Up to 5 mg/l
Up to 4 mg/l
Proper maintenance of the boiler is
required when water quality does
not meet standards. Damage caused
by poor water quality is not covered
under warranty. The table above shows
the maximum contaminant levels
allowed. If you suspect that your water
is contaminated in any way, discontinue
the use of the boiler and contact an
authorized technician or licensed
professional.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ncb-190/080hNcb-240/110hNcb-240/130hNcb-250/150h

Table of Contents