About The Vent Installation Detector - Navien NCB-190/060H Installation & Operation Manual

Condensing combi-boilers
Hide thumbs Also See for NCB-190/060H:
Table of Contents

Advertisement

DANGER
If the connections leak, harmful flue gas may
cause personal injury or death. after completing
the installation and filling the boiler with water,
turn on the boiler and test for leaks using a
bubble test kit. After applying the soap solution,
bubbles will form on the connection if any leaks
exist.
5.2 About the Vent Installation
Detector
This boiler unit comes pre-installed with a Vent
Installation Detector ("VID") to assist the installer in
properly installing the Vent Pipe into the vent collar.
How It Works
As shown, the VID is a device connected to the vent
collar which is intended to detect whether the vent
pipe has been inserted to a sufficient depth into the
collar during its initial installation.
During installation, the VID detects whether the
vent pipe is fully inserted (at least 3.0 inches or 76
mm) into the collar. If a correctly sized vent pipe
(2.0 inches) is fully inserted into the collar, it will
press against a switch to activate the VID. If the vent
pipe is not fully inserted into the collar, the unit will
display an error message and will not operate. Make
sure the vent pipe is correctly sized and has been
inserted properly if Error 762 appears.
60
Venting for Combustion Air
Purpose
The VID's purpose is to guide the installer to fully
insert the vent pipe to a depth of at least 3.0 inches
or 76 mm, into the collar. If the vent pipe is not
properly inserted and installed, it could separate
from the collar resulting in flue gas spillage and
carbon monoxide emissions which will result in
severe personal injury or death.
WARNING
The VID is not intended and should not be relied
upon to detect all instances of the vent pipe's
vertical movement or separation from the
collar. Various factors, including but not limited
to sensor failure, switch sticking and corrosion,
may cause the VID to remain activated after the
vent pipe separates from the collar.
Limitations
The VID is not an alarm, safety switch or a substitute
for a carbon monoxide detector. The VID may not
cause the unit to stop operating if the vent pipe
is partially or completely dislodged. Other factors
can impact the performance of the VID causing
it to be unable to function as intended. Such
factors include, but are not limited to, deformity
of the vent pipe, not using a correctly sized vent
pipe, misalignment of the vent pipe into the collar,
vertical movement of the vent pipe caused by
improper installation, and other misuse or non-
conformance with installation instructions.
WARNING
The list above does not represent an
exhaustive list of situations that may prevent
proper operation of the VID. It is the installer's
responsibility to install the vent pipe properly
and to adequately secure the unit to the wall.
The vent pipe must be inserted 3.0 in (76 mm)
into the boiler collar. If the vent pipe is not
fully inserted, the vent installation detector
switch will detect it and the boiler may not
operate. Make sure that the pipe is inserted
properly and that only the correctly sized
vent pipe materials are used or an error code
E762 can appear on the front panel.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ncb-190/080hNcb-240/110hNcb-240/130hNcb-250/150h

Table of Contents