Lochinvar Armor AWH0400N Installation & Operation Manual page 60

Table of Contents

Advertisement

11
Start-up
Check flame and combustion
1. Turn the main power off to the appliance by placing the
"On/Off" switch in the OFF position.
2. Remove the flue temperature sensor from the flue collector.
NOTE: Combustion measurements will be made at this
point.
3. Insert the probe from a combustion analyzer into the hole
left by the removal of the flue temperature sensor.
4. Turn the main power on to the appliance by placing the
"On/Off" switch in the ON position.
5. Navigate to the Setup Screen from the Home Screen by
pressing the SETUP button along the left side of the screen.
Enter the installer password.
Figure 11-3 Service Maintenance Screen
60
Installation & Operation Manual
6. Select the Service Maintenance Screen. The tabs will scroll
(up and down) to reveal more options. See FIG. 11-3.
7. Once the heat exchanger has modulated up to rate, measure
the combustion. The values should be in the range listed in
the Armor Service Manual. CO levels should be less than
200 ppm for a properly installed unit. If the combustion
is not within range reference the Troubleshooting Section
in the Armor Service Manual for possible causes and
corrective actions.
8. Once the combustion analysis is complete, test the safety
shutoff device by turning the manual shutoff valve to the
OFF position and ensuring that the appliance shuts down
and registers an alarm. Open the manual shutoff valve and
reset the control.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents