Highlights Of As 620 - Siemens TXP-CLC Manual

Table of Contents

Advertisement

Highlights of AS 620

FUM B
Fully integrated High Speed Turbine Controller (AS 620 T)
Flexible configurations:
Central configuration of the APs and FUMs in standard cabinet
equipment
Distributed configuration of the SIMs located near the process I/O
Integrated communication to PLCs (SIEMENS as well as other vendors'
PLCs)
Wide variety of AP system configurations for various levels of redundancy
and special applications
Capable of time resolution down to 1ms (FUM)
System wide time accuracy of 10ms
6
Copying of this document, and giving it to others and use or communication of the contents, are forbidden without express authority. Offenders are liable to the payment of
damages. All rights are reserved in the event of the grant of a patent or the registration of a utility model or design.
AS 620
AS 620 B
AS 620 F
AS 620 B
AS 620 B
AS 620 F
AS 620 F
AP
AP
AP
APF
FUM B
FUM F
FUM F
SIM B
SIM B
Training Center
AS 620 T
AS 620 T
AS 620 T
Auxiliary plant
Auxiliary plant
Auxiliary plant
Plant bus
Plant bus
AP
APT
AGF
S5 AG
SIM T
SIM F
S5 I/O
SIM F
TXP-CLC Course
AP
S5 AG
S5 I/O

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents