Direct Vent - Vertical Concentric - Weil-McLain EcoTec 80 Manual

Wall mount gas-fired condensing boilers - combi and heating only models
Table of Contents

Advertisement

G
-
®
ECO
Tec
AS
FIRED WATER BOILER
DIRECT VENT —
1. The concentric termination kit must be purchased
separately.
Use only the vent materials and kits listed in
Figure 27, page 23 . Provide pipe adapters if
specifi ed.
2. Locate the termination such that the total air piping and
vent piping from the boiler to the termination will not
exceed the maximum length given in Figure 26, page 22 .
3. This termination requires a 45-degree elbow that is not
supplied with the termination kit. The maximum vent/
air pipe lengths include allowance for this elbow.
For polypropylene applications, See venting
and air piping notes on page 21 .
For AL29-4C vent pipe applications,
See venting and air piping notes on page 21 .
Locate the concentric vent/air termination using the
following guidelines:
1. The concentric vent/air assembly must terminate as
shown in Figure 46, page 37
2. The termination must comply with the clearances and
limitations shown in Figure 28, page 25 .
3. Locate the termination so it is not likely to be damaged
by foreign objects, such as stones or balls, or subject to
buildup of leaves or sediment.
4. For Canadian installations, follow requirements of CSA
B149.1 or B149.2 Installation Code and a ULC S636
compliant vent kit.
1. When terminating multiple boilers, install the concentric
vent/air termination assemblies as described in this
manual.
All vent outlets must terminate at the same
height to avoid possibility of severe personal
injury, death or substantial property damage.
2. Place roof penetrations to obtain minimum clearance
of 12 inches between the edges of adjacent vent pipes
of other boilers for U. S. installations (see Figure 45 ).
3. For Canadian installations, provide clearances
required by CSA B149.1 or B149.2 Installation Code
and a ULC S636 compliant vent kit.
4. The air inlet of a boiler is part of a direct vent connection.
It is not classifi ed as a forced air intake with regard to
spacing from adjacent boiler vents.
1. Roof penetration hole:
a. Cut a clearance hole to clear the termination outside
diameter as prescribed in the kit instructions.
b. Insert a corrosion resistant metal thimble in the
vent pipe hole.
36
80/110/150/199
Vertical concentric
B
OILER
Read and follow all instructions in this manual.
left and page 21 .
Install the boiler in a location that allows proper routing of all
vent and air piping to the selected sidewall location.
Make sure the selected vertical termination location complies with
Figure 28, page 25 . (Multiple boiler concentric terminations must
also comply with Figure 45, page 37 .)
Use only the vent materials listed in Figure 27, page 23 . Provide
pipe adapters where required.
Vent piping and air piping lengths must not exceed the values
shown in Figure 26, page 22 .
The concentric termination must be assembled and installed
before piping from the boiler to the termination.
Prepare the vertical penetration(s) — assemble the concentric
termination kit and secure the penetration components as
instructed in this section. Provide the supports indicated and
mount the termination assembly. See "Prepare roof penetrations"
on page 36 and "Mount concentric termination" on page 37 .
See notices at left and page 21 .
Install vent and air piping between the boiler and the concentric
vent/air termination. Slope horizontal piping downward toward
the boiler at least 1/4 inch per foot. See page 27 for general
guidelines.
Install pipe supports every 5 feet on both the horizontal and
vertical runs.
Install a hanger support within 6 inches of any upturn in the
piping.
See notices at left and page 21 .
— DO NOT use short radius elbows for vent
or air piping. Boiler performance could be affected.
M
ANUAL
— Concentric vertical
See notices at
See notices at left and page 21 .
Part number 550-100-260/0520

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ecotec 110Ecotec 150Ecotec 199

Table of Contents