Graco Reactor A-20 Operation page 16

Air operated, electrically heated plural component proportioner
Hide thumbs Also See for Reactor A-20:
Table of Contents

Advertisement

Setup
Step Two - Reposition Power Jumpers
Find location of Power Jumpers.
Step Two
TB2
Terminal Blocks
Position red jumpers
(under back cover on
opposite side)
16
Power Jumper
Location
ti8609a
(as shipped)
For 230V, 1 Phase and 230V, 3 Phase Installations,
change jumper positions as shown below. Machine is
shipped with jumpers in the fail-safe 380 3Ø position.
1. Remove upper rear control cover screws and cover.
2. Move one red jumper from the storage positions to
the positions shown for your power.
A flat-blade screwdriver can be used under the
ridge on the side of the jumper to remove them.
Push the jumper firmly into the new position.
3. Replace rear cover and two screws.
ti8610a
311511G