2 ] Annual/Weekly/Today Schedule - Mitsubishi Electric MEHITS CH Technical Manual

Air conditioning control systems
Table of Contents

Advertisement

[6. Schedule Function of MEHITS CH & HP ]
[2] Annual/Weekly/Today schedule
The annual, weekly (Weekly 1 to Weekly 5) and today's schedules can be set on the main unit or Web browser by the
standard function of AE-200/AE-50/EW-50.
[Weekly schedule]
1. It can be set in 1-minute interval.
2. Items can be set 24 times per a day (each day of a week).
8 times per day for HWHP (QAHV) (each day of a week)
Partial setting, such as only operation mode setting or temperature setting, is available.
3. Settable items are as follows; ON/OFF, operation mode, temperature, fan speed, air flow direction, and operation
prohibition from the local remote controllers.
4. Objectives can be set for each group, block, floor or all groups.
5. 5 patterns of weekly schedule (Weekly 1 to Weekly 5) can be set.
6. The period (month, day) for each of Weekly 1 to Weekly 5 can be set.
[Annual schedule]
1. It can be set in 1-minute interval.
2. 50 specific days can be set within the period of 24 months including the current month.
3. Objectives can be set for each group, block, floor or all groups collectively.
4. Up to 5 schedule patterns can be set and allotted each pattern to a specified day.
(Setting contents are the same as the weekly schedule.)
Weekly and seasonal schedule shall not be executed on the day the annual schedule is also set.
[Today schedule]
1. It can be set in 1-minute interval.
2. Objectives can be set for each group, block, floor or all groups collectively.
3. The today's schedule is implemented in priority to other schedules.
(Setting contents are the same as the weekly schedule.)
28

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mehits hp

Table of Contents