Start-Up Report; Electrical Information - Pentair Pool Products Myers MWH50 Series Installation And Service Manual

Submersible sump effluent & sewage pumps
Table of Contents

Advertisement

Distributor:__________________________________________________ Order No.: _________________________
Installing Contractor: _________________________________________ Phone: ____________________________
Sales Contact: ______________________________________________ Phone: ____________________________
Customer: ______________________________________________________________________________________
Location: _______________________________________________________________________________________
1. SYSTEM INFORMATION
Size of Wet Well:_______________________________________Manufacturer: _____________________________
Discharge from Bottom of Basin: ________________________Discharge Location:________________________
Inlet from Bottom of Basin: _____________________________Inlet Location: _____________________________
Type of Check Valves: __________________________________Type of Piping: ____________________________
Does System Have Suction Gauges?
Does System Have Discharge Gauges?
Liquid Being Pumped:_______________________Temperature (F°): __________ Pct. of Solid (%):___________
Is a Sketch or Photograph of System Available?
Any Additional Comments on System:______________________________________________________________
_______________________________________________________________________________________________

2. ELECTRICAL INFORMATION

Control Panel Part Number: _____________________________Panel Rated Amps: ________________________
Manufacturer: _________________________________________Voltage: _______________ Phase: ____________
Heater Size:___________________________________________Location of Panel to Wet Well: _______________
Incoming Line Voltage: _________________________________Actual? ___________________________________
Voltage to Pumps: _____________________________________Actual? ___________________________________
Type of Junction Box: __________________________________Manufacturer of Junction Box: ______________
Are Floats Installed in Wet Well?
Are Floats Wired for Proper Sequencing?
Is the Seal Leak Detection Hooked Up?
Any Additional Comments on Electrical: ____________________________________________________________
_______________________________________________________________________________________________
3. PUMP INFORMATION
Type of Pump:_________________________________________Serial Number of Pump: ____________________
Voltage of Pump: ________________ Phase: _______________RPM: _________________ Amps: ____________
Impeller Size:____________________ C.O.S. TDH: __________GPM: _________________
Voltage Supplied from Panel:____________________________Actual? ___________________________________
Actual Amperage (All Phases): Phase 1 Amps: ________ Phase 2 Amps: ________ Phase 3 Amps: ________
Define the Rotation of the Pump:
Method Used to Check Rotation:
Any Additional Comments on Pumps: ______________________________________________________________
_______________________________________________________________________________________________
4. ACKNOWLEDGE
Acknowledge that all information is accurate and proper procedures have been followed.
Customer: ___________________________________________________________________ Date: _____________
Start-up Technician:___________________________________________________________ Date: _____________
Send to Warranty Manager, 1101 Myers Parkway, Ashland, OH 44805
or Fax to 419-207-3344
or email to startupreport@femyers.com
or submit online at http://forms.pentairliterature.com/startupform/startupform.asp?type=m

START-UP REPORT

Yes
No
Suction Pressure Reading: __________________
Yes
No
Discharge Pressure Reading:________________
Yes
No
Yes
No
Are Floats Set to Engineer's Specs?
Yes
No
Are Heat Sensors Hooked Up?
Yes
No
Clockwise
Counterclockwise
Viewed from the Top
Viewed from the Bottom
If So, Please Attach.
Yes
No
Yes
No

Advertisement

Table of Contents
loading

Table of Contents