Advertisement

Quick Links

NOVUS 3000
STANDARD ELECTRICAL
CONTROLS
INSTALLATION AND SERVICE MANUAL
NOTE! To the installer: Please make sure you provide this manual to the owner of the equip ment or to the responsible
party who maintains the system.
Item # H-03-519 | Part # 5625-519-1 | © 2012 Pentair Pump Group, Inc. | 11/02/12

Advertisement

Table of Contents
loading

Summary of Contents for Pentair Hydromatic NOVUS 3000 Series

  • Page 1 NOTE! To the installer: Please make sure you provide this manual to the owner of the equip ment or to the responsible party who maintains the system. Item # H-03-519 | Part # 5625-519-1 | © 2012 Pentair Pump Group, Inc. | 11/02/12...
  • Page 2: General Information

    test push button switches on each Do not attempt to operate this unit General of the float inputs as well as an on any other voltage or power Information indicator that will illuminate if distribution other than for which the floats do not close in the it was originally designed (check correct order.
  • Page 3: Start-Up Operation

    always disconnect the power c. Connect all the float control it will be called. If the alternator first. Do not smoke or use leads or 4-20mA leads to the is set in the on position, then for sparkable electrical devices or appropriate panel terminals.
  • Page 4: Pump Maintenance

    Black, and Red pow er Pump Start-Up: voltage from terminal 1 to wires are con nect ed to pan el terminal 2 on the start relay Refer to pump Installation and correct ly. to be sure that the relay has Service Manual.
  • Page 5 Spare Parts List: Install the ON / LEAD floats a lag pump and its seal fail lamp and output are activated. The seal fail minimum of 4 inches above the following list OFF float. If additional volume does not disable the pump. recommended spare parts.
  • Page 6: Auxiliary Relay

    SW6 – When this switch is set, the If the reset button is pushed or Fail To time between pump starts and the the external reset/mute input is activated, then the horn relay delay for the fail to start test is 12 Start Test seconds instead of 6 seconds.
  • Page 7: Pump Troubleshooting

    Storage Temperature –20° C to e. Check wiring of pump to Short Circuit Current less than 2 Ma. 65° C con trol panel. It should agree with the sche mat ic. Open Circuit Voltage 5.0 VDC 0% to 95% relative humidity, non- f.
  • Page 8 6. Short cycling pump. 4. Again read the amperage of Pump each lead. a. Check float controls. Troubleshooting 5. Move each lead to the next terminal 7. Run light stays on. (1 to 3, 2 to 1, 3 to 2). a.
  • Page 9 3. Capacitor check. 4. Start relay check. d. Place the H-O-A switch in the Hand position to start a. Make sure the ca pac i tor is a. Check the coil re sis tance It the pump. dis charged. Use extreme should be 3,000 to 15,000 caution as a spark might ohms.
  • Page 10 THIS PAGE INTENTIONALLY LEFT BLANK...
  • Page 11 THIS PAGE INTENTIONALLY LEFT BLANK...
  • Page 12 Pentair Hydromatic will cover only the lower seal and labor thereof for all dual seal pumps. under no circumstance will Pentair Hydromatic be responsible for the cost of field labor, travel expenses, rented equipment, removal/reinstallation costs or freight expenses to and from the factory or an authorized Pentair Hydromatic service facility.