4. Open the funnel plug and pour the
sanitizing solution in the reservoir and
wait at least 10 minutes
5. Unscrew the two fastening screws
and remove the bin cover
6. Lift up the ice level control and its
bracket from its housing and carefully
stand it on the frame of the unit
Remove ice, distribution vane and steel
bottom from the storage bin
7. Using the same carafe, prepare again
500 ml of warm water (40‐50°c) and 15
ml of Scotsman Sanitizing product and
pour of the solution on the internal
sides of the storage bin
8. Using a sanitised disposable cloth,
clean the ice bin and rinse with clean
water.
9. Close the funnel plug and reinstall all
the previously removed panels and
parts by following the procedure in
reverse order, paying attention that
both the steel bottom and the upper
shaft of the blade are properly seated.
11