Installing The Cooker Hood; Installation Requirements - Zanussi TH 500 Instruction Booklet

Integrated cooker hood
Hide thumbs Also See for TH 500:
Table of Contents

Advertisement

Please ensure that when the appliance is
installed it is easily accessible to an
engineer in the event of a breakdown.
All installations must comply with the
local authorities requirements for the
discharge of exhaust air.
Incorrect installation may affect the
safety of this cooker hood.

Installation Requirements

Before installation check the wall to
which the cooker hood is to be fitted for
electric cables, water pipes or gas.
Ducting
The ducting must be fire retardant 125mm (5ins)
in diameter and the length should be nomore than:
3 metres with one 90
2 metres with two 90
Bends of more than 90
efficiency of the hood and reduce the airflow.
Clearance Height
The cooker hood is designed to be fitted over
a cooking appliance at the clearance heights
stated, providing the maximum output of the
appliance beneath does not exceed the
maximums quoted in the Technical Specifications.
If the output of the appliance below the
cooker hood exceeds the maximum outputs
quoted, please refer to the cooker
manufacturer's installation instructions.

INSTALLING THE COOKER HOOD

0
bend
0
bends
0
will reduce the
11

Advertisement

Table of Contents
loading

Table of Contents