Download Print this page

Toro 78493 Installation Instructions Manual page 5

Boot and tube kit for 100 series z master 52 inch mowers/200 series z master 52 inch mowers

Advertisement

2
Figure 8
1. Center tunnel baffle
2. Carriage Bolt, 5/16 x
5/8 in.
3. Flange nut, 5/16 in.
Installing the Cutting Chamber
Baffle
1. Place the cutting chamber baffle behind the right
cutting chamber and against the mower flange
(Fig. 11).
2. Install the cutting chamber baffle to the center baffle
and rear baffle with 1 button head socket bolt (5/16 x
3/4 in.) and 1 flange nut (5/16 in.) (Fig. 12).
3. Align the cutting chamber baffle so the baffle flange is
3–1/2 in. (89 mm) from the top of the cutting chamber
(Figures 9 and 10).
Important
Make sure the baffle flange is 3–1/2 in.
(89 mm) from the top of the cutting chamber and there is
blade clearance of 3/8 in. 1/16 in. (Figures 9 and 10).
4. Clamp the baffle in place.
5
4
3
1
6
m–5934
4. Flush edge with mounting
bracket
5. Front tunnel baffle
6. Rear hole in baffle
1
4
Figure 9
1. Baffle flange
2. Blade
3. Spindle
4
Figure 10
1. Baffle flange
2. Blade
3. Spindle
5. Using the baffle as a template, drill two, 11/32 in.
diameter, holes into the side of the cutting chamber
(Fig. 11).
6. Drill two, 9/32 in. diameter, holes into the bottom of
the mower flange (Fig. 11). The holes must be
centered on the mower flange.
7. Remove the clamp.
5
5
2
3
m–6087
4. Blade clearance,
3/8 in. 1/16 in.
5. Baffle to top of cutting
chamber, 3–1/2 in.
1
2
3
m–6082
4. Baffle to top of cutting
chamber, 3–1/2 in.

Advertisement

loading

This manual is also suitable for:

78494