Download Print this page

Toro 78493 Installation Instructions Manual page 4

Boot and tube kit for 100 series z master 52 inch mowers/200 series z master 52 inch mowers

Advertisement

4
5
Figure 6
1. Rear tunnel baffle
2. 3/16 in. gap
3. Baffle tab
4. Tighten the carriage bolt (5/16 x 5/8 in.) into the top of
the mower (Fig. 7).
5. Clamp the baffle in place.
6. Using the baffle as a template, drill one, 11/32 in.
diameter, hole into the top of the discharge tunnel
(Fig. 7).
7. Drill one, 11/32 in. diameter, hole into the rear wall of
the discharge tunnel (Fig. 7).
8. Remove the clamp.
9. Install the rear tunnel baffle with 2 carriage bolts
(5/16 x 5/8 in.) and 2 flange nuts (5/16 in.) (Fig. 7).
Important
Make sure the bolt heads are installed on
the inside of the cutting chamber.
2
3
1
1
m–6043
4. Blade
5. Tunnel rear wall
2
1
5
7
4
3
m–5937
Figure 7
1. Rear tunnel baffle
2. Inside Carriage Bolt, 5/16
x 5/8 in.
3. Flange nut, 5/16 in.
4. Hole to drill
Installing the Center Tunnel
Baffle
Important
Do not install this baffle when bagging
grass unless blowout is a problem. This baffle is highly
recommended when bagging leaves.
Note: Remove this baffle once the cutting chamber baffle
is installed.
1. Place the center tunnel baffle between the front and
rear tunnel baffles (Fig. 8).
2. Install the center tunnel baffle to the front tunnel
baffle. The flange on the center baffle goes over and
behind the front baffle (Fig. 8).
3. Install the center tunnel baffle to the existing holes in
the front tunnel baffle. Use 2 carriage bolts (5/16 x
5/8 in.) and 2 flange nuts (5/16 in.) (Fig. 8).
4
2
2
3
6
4
5. Tunnel rear wall
6. Mounting bracket
7. Existing hole
8. Carriage Bolt, 5/16 x
5/8 in.

Advertisement

loading

This manual is also suitable for:

78494