Installing The Air Duct - Huawei 2288H V5 User Manual

Table of Contents

Advertisement

2288H V5 Server
User Guide
Step 9 Place the removed air duct in an ESD bag.
----End

3.9 Installing the Air Duct

Step 1 Wear an ESD wrist strap. For details, see
Step 2 Power off the server. For details, see
Step 3 Remove the power cables. For details, see
Step 4 Remove the server. For details, see
Step 5 Remove the chassis cover. For details, see
Step 6 If the server is configured with a full-height full-length riser card tray, remove it. For details,
see
Step 7 Take a spare air duct out of its ESD bag.
Step 8 Align the positioning pins on the air duct with the fixing holes on the mainboard according to
the signs on the air duct. Vertically place the air duct downwards. See
Figure 3-16 Installing the air duct
Step 9 If the server is configured with a supercapacitor, connect the supercapacitor to the TFM. See
Figure
Issue 04 (2018-09-04)
3.12 Removing a Riser Card
3-17.
Copyright © Huawei Technologies Co., Ltd.
12 Preventing Electrostatic
3.2 Powering Off the
3.7 Removing Cables from a
3.3 Removing the Server and Guide
3.4 Removing the Chassis
Tray.
3 Basic Operations
Discharge.
Server.
PSU.
Rails.
Cover.
Figure
3-16.
57

Advertisement

Table of Contents
loading

This manual is also suitable for:

V100r005

Table of Contents