Yard-Man 7100-1 Operating Manual And Parts List page 7

26 inch 7 h.p. snow thrower
Table of Contents

Advertisement

REPLACING SAFETY SHEAR BOLT
CHUTE CHAIN AND ADJUSTMENT
To tighten the chute chain, rotate the chute all the way to
the left, until the adjustment bolt is accessible. Tighten the
adjustment nut to tighten the chain.
CAUTION: Chain should be kept snug on chute housing.
CHUTE CABLE ADJUSTMENT
..~~.
-..:\."~,\,-"..'
.~.4n:",;.,_:
!
:~
"...,,'.";",
",
~"""'~H.I
~"T"-:;iNi i~
liST"i E~NT "",
To set .or adjust .the shift panel for correct
speeds, place
master clutch
control
in neutral position and the shift lever
into the fifth speed notch.
loosen
~he'two mounting
bolts
and push sh.ift lever. right
as far as ~llowed,
hold,. and
tighten
mounting
bolts.
DO NOT ATTEMPT
THIS
AD-
JUSTMENT
WITH
THE
ENGINE
RUNNING.
To check
adjustment,
start engine, move shift lever to first speed
notch
and engage master
clutch
control.
Unit
should
move forward
.very slowly.
NOTE: Adjustment section continued on page 12.
7
If the intake snow reel should jam causing the safety shear
bolt to shear, it may be replaced with a new bolt, furnished
in the parts bag, after removing
the broken pieces in the
shaft. NOTE: Always align the hole in the reel shaft and the
sprocket shaft before driving out the broken bolt.
Remove cable roller cover, loosen the locking bolt on top
of the cable roller bracket and tighten the adjustment bolt
on the side.
CAUTION: The cable should not be adjusted too tightly,
adjustment should allow the spout to rotate freely.
R.e~ighten th~ locking bolt and replace the cable r~ller
cover.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents