Daily Maintenance Schedule - Powermate ALUMINUM L Series Operating Manual

Table of Contents

Advertisement

DAILY MAINTENANCE SCHEDULE

NOTE: If attempting any service repair work disconnect the battery by
depressing the toggle on the circuit breaker.
 Inspect unit frame for structural damage.
 Inspect wheels and tires. Grease the wheels if required.
Ensure the cotter pins are in place.
 Inspect all bolts and fasteners are in place and secure.
 Inspect the load straps for damage. Nicks or tears are not
acceptable.
 Inspect the push button switches for condition and
operation. Make sure the wiring is secure.
 Test the circuit breaker for operation. Cycle the unit
testing for operation, direction and smoothness.
 Observe the roller operation in the outer frame rails. Oil
rollers as required. Inspect the drive screw and ballnut for
damage, bending (wobble during operation), and
lubrication.
 Ensure the operating manual is readily available for
reference.
Keep the battery fully charged.
FOR PARTS AND SERVICE CONTACT:
1-800-697-Mate
 
 
8.05
®
PowerMate
Operation Manual
 
 
PN 011820 Rev.F
Eng. 12/ 09/ 20

Advertisement

Table of Contents
loading

Related Products for Powermate ALUMINUM L Series

This manual is also suitable for:

Aluminum l-1Aluminum l-2L-seriesL-1L-2

Table of Contents