Step 3. Connect the Signals

Caution
To ensure the specified EMC performance, operate this product only with shielded cables
and accessories.
Note
Refer to the Read Me First: Safety and Electromagnetic Compatibility document before
removing equipment covers or connecting or disconnecting any signal wires.
To connect signals to the terminal block, refer to Figures 3 and 4 while completing the following steps:
Note
You can find the pinout names and locations in MAX at any time by right-clicking the device
name under Devices and Interfaces and selecting Device Pinouts.
1.
Loosen the captive top cover screws and remove the top cover.
2.
Loosen the strain-relief screws and remove the strain-relief bar.
3.
Prepare the signal wire by stripping the insulation no more than 7 mm (0.28 in.).
4.
Run the signal wires through the strain-relief opening.
3
8
1
Strain-Relief Screws
2
Strain-Relief Bar
3
Tie Wrap Holes
© National Instruments Corporation
1
1
2
4
9
4
Ground Lugs
5
Terminal Block to Module Connector
6
Captive Top Cover Screws
Figure 3. TB-4353 Parts Locator Diagram
6
4
5
5
NI PXIe-4353 and TB-4353 Terminal Block Installation Guide
6
7
7
Top Cover
8
Tie Wraps
9
Signal Wires