Download Print this page

Verify The Components; Connect Signals - National Instruments TB-2627 Installation Instructions Manual

Terminal block for the ni pxi/pxie-2527

Advertisement

Caution
Do not install a damaged terminal block on a switch terminal block.
Store the terminal block in the antistatic package when not in use.

2. Verify the Components

Make sure you have the following:

3. Connect Signals

Ensure that power has not been applied to signals prior to connection. Only
Caution
trained and qualified service personnel should install and connect signals.
To connect signals to the terminal block, complete the following steps:
1.
2.
3.
4.
5.
6.
7.
8.
9.
© National Instruments Corporation
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
NI TB-2627 terminal block
NI PXI/PXIe-2527 switch module
PXI chassis
1/8 in. flathead screwdriver
Wire cutter
Wire insulation stripper
Prepare the signal wire by stripping the insulation no more than
3/16 of an inch from the end of the wire.
Remove the terminal block top cover screws with the flathead
screwdriver.
Gently lift the top cover off the terminal block.
Loosen the two screws on the strain-relief assembly and remove the
top strain-relief bar.
Connect the safety earth ground to a safety ground lug.
Connect the wire to the terminal by inserting the stripped end of the
wire into the terminal. When connecting a signal, refer to the terminal
reference diagram in Figure 4.
Tighten the screw for the terminal to secure the connection.
Pull the wire through the strain-relief bar to remove the slack in the
wiring.
Replace the strain-relief bar and tighten the two screws on the
strain-relief assembly to secure the cables.
3
NI TB-2627 Installation Instructions

Advertisement

loading