Husqvarna 325iLK Workshop Manual page 19

Hide thumbs Also See for 325iLK:
Table of Contents

Advertisement

5.4.9 To install the cable into a product with a
mechanical user interface
1. Make a note of the Husqvarna identification number
(HID) of the new digital user interface before you
install it. The identification number is found on the
new control unit.
2. Connect the user interface to the end of the cable
with 2 pieces of tape.
3. Put the main switch in the handle.
4. Install the cable in the handle as shown in the
illustration.
726 - 002 - 23.01.2020
5. Install the cable in the battery housing as shown in
the illustration.
6. Install the cable holder.
7. Install the power trigger and the power trigger
To remove and install the power
lockout. Refer to
trigger lockout, power trigger and mechanical user
interface on page 18 .
8. Assemble the control handle.
5.4.10 To install the power trigger and power
trigger lockout in a control handle with a
mechanical user interface
1. Put the power trigger in the control handle.
2. Attach the spring to the power trigger lockout if it is
To install the spring on the
necessary. Refer to
power trigger lockout on page 17 .
Repair instructions - 19

Advertisement

Table of Contents
loading

Table of Contents