Hach QuikChem 8500 2 Series Installation Manual page 12

Hide thumbs Also See for QuikChem 8500 2 Series:
Table of Contents

Advertisement

Available languages

Available languages

Install the pump tubing
1. Remove all of the cartridges from the pump. Refer to
2. Attach the tubing to the cartridge. Refer to
3. Attach the cartridge to the pump. Set the tension lever one click to the left. Refer to
Figure 5 Cartridge removal
1 Pump
Figure 6 Attach cartridge and tabs to the tubing
1 Color-coded tab
2 Tension lever
12 English
Figure
6.
2 Pump cartridge
3 Pump cartridge
4 Pump tubing
Figure
5.
3 Cartridge holder
5 To injection valve, wash station
or manifold
6 From reagent, sample, wash
solution, buffer or other
chemicals (varies with method)
Figure
7.

Advertisement

Table of Contents
loading

Table of Contents