Summary of Contents for feather & black Provence 2 Door Wardrobe
Page 1
Provence Collection 2 Door Wardrobe Step By Step Assembly Instructions PRE-ASSEMBLY PREPARATION 1. Please check the part contents before attempting to assemble this product. A full checklist of components is given in this leaflet. If any components are missing, please contact the retailer from whom you bought this product.
Page 2
I (Fixed on the side panel by the vendor) Panel and Fittings Identification Item Description Qty. Item Description Qty. Item Description Qty. Base Left Side Panel Right Side Panel Top Cornice Back Panel Shelf Door Frame Hanging Rail Rail Support 25mm CSK Screws 30mm CSK Screws Dowel...
Page 3
Step 1 -Use the adjustable levelers POSTS TO to level the wardrobe base (A) on uneven floor surface. REAR! Place dowel (L) both top and bottom of each panel. With the aid of an assistant, locate the side panels (B&C) into the base unit (A).
Page 4
Step 3 With the aid of an assistant, locate the cornice (D) as shown. Secure using ten 30mm screws ( K ), three for each panel and four into the top of the door frames. K x 10 SHOWN WITH DOORS REMOVED FOR CLARITY OF ILLUSTRATION ONLY Step 4...
Page 5
Step 5 -Push fit the four shelf pins (M) at the desired heights. Locate the shelf (F) noting the 'Notched' corners as shown. Screw the 16mm screws (N) into the underside of the shelf through the pins. Push fit the hanging rail supports (I) and locate the hanging rails (H).
Page 6
Provence Collection 2 Door Wardrobe It may be required to adjust the top and bottom locking pins on the door frame, enabling the hooks to locate and lock onto the pin. If required loosen and remove screws on the pin and locate into the correct position, then re-attach the screws.