Maintenance
Introduction

Preventive Maintenance Schedule

WBPEEUI260047A0
The reliability of any stand-alone product or control system is
affected by the maintenance of the equipment. ABB Automa-
tion recommends that all equipment receive preventive mainte-
nance which will keep the equipment operating at an optimum
level.
This section presents procedures that the customer should be
able to perform on site. These preventive maintenance proce-
dures should be used as a guideline to assist in establishing
good preventive maintenance practices.
Personnel performing preventive maintenance should meet the
following qualifications.
Maintenance personnel should be qualified electrical tech-
nicians or engineers that know the proper use of test
equipment.
Maintenance personnel should be familiar with the module
mounting unit and field termination panel, have experience
working with process control systems, and know what pre-
cautions to take when working on live AC and/or DC
systems.
Table
3-1
is the preventive maintenance schedule for the
NTHS03 termination unit. The table lists the preventive main-
tenance tasks in groups according to their specified mainte-
nance interval. Tasks that require further explanation are
covered under
Preventive Maintenance
Preventive Maintenance Procedures
Preventive Maintenance Procedures
Preventive Maintenance Procedures
NOTE: The preventive maintenance schedule is for general purposes only.
Your application may require special attention.
Section 3
Procedures.
3 - 1