Jumper Settings - ABB Symphony Harmony Series Instruction

Hydraulic servo termination unit
Hide thumbs Also See for Symphony Harmony Series:
Table of Contents

Advertisement

Termination Unit Installation
Table 2-2. Jumper Settings
Fuse Installation
ABB Automation ships a 3 ampere (slo blo)/250 volt fuse (ABB
Automation P/N 1948182?33001) with every NTHS03 termina-
tion unit. Verify the fuse is correctly installed in fuse holder F1.
Termination Unit Installation
The termination unit is ready for installation when the dip-
shunts are properly configured and installed, the jumpers are
properly installed, and the fuse is in place. The termination
unit mounts on a standard NFTP01 panel as shown in
Figure 1-2.
Mounting
To mount the NTHS03 termination unit to the field termination
panel:
1. Remove the safety shield.
2. Insert the tabs of the circuit board into the proper slots of
the termination panel standoff as shown in Figure
slide the circuit board into position.
3. Secure the termination unit circuit board to the field termi-
nation panel with two No. 10 thread-forming screws (Fig. 2-2).
2 - 4
Jumper
J1 - J4
System (IMHSS03 module)
J1 - J4
External
Power Source
Setting
1 - 2
2 - 3
2-2
and
WBPEEUI260047A0

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nths03

Table of Contents