Step 14 Performing The Final Check; Step 15 Providing Information For User - Samsung AM TNVD Series Installation Manual

Hide thumbs Also See for AM TNVD Series:
Table of Contents

Advertisement

Step 14 Performing the final check

To complete the installation, perform the following checks
and tests to ensure that the air conditioner operates correctly.
1
Check the following:
Strength of the installation site
Tightness of pipe connection to detect gas leak
Electric wiring connection
Heat-resistant insulation of the pipe
Drainage
Grounding conductor connection
Correct operation (follow the steps below)
button and check the following:
2
Press the
The indicator on the indoor unit lights up.
The airflow blade opens and the fan gears up for
operation.
3
Press any button and check the following:
The appropriate indicator lights up and the air
conditioner operates according to the selected
mode or function.
4
Press the
button and check the following:
The airflow blades work properly.
5
Press the
button and check the following:
The airflow blades work properly.
NOTE
The
button is only for Wind-Free models.
DB68-08953A-00_IM_DVM QMD_EU_EN_.indd 31

Step 15 Providing information for user

After finishing the installation of the air conditioner, you
should explain the following to the user. Refer to appropriate
pages in the user & installation manual.
1
How to start and stop the air conditioner
2
How to select the modes and functions
3
How to adjust the temperature and fan speed
4
How to adjust the airflow direction
5
How to set the timers
6
How to clean and replace the filters
NOTE
When you complete the installation successfully, hand
over the user & installation manual to the user for
storage in a handy and safe place.
English
31
2020-02-10 오후 4:23:12

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Am tnad series

Table of Contents