System Installation - Dell Networking S4048T-ON Getting Started Manual

Hide thumbs Also See for Networking S4048T-ON:
Table of Contents

Advertisement

Figure 7. Four-post threaded configuration

System installation

You can mount the system in the 1U front-rack or 1U two-post flush or center
configurations. For the 1U two-post flush or center configurations, slide the system into the
rails in the same manner as the four-post configurations.
The following is an example of a 1U front-rack configuration:
16
Hardware installation

Advertisement

Table of Contents
loading

Table of Contents