Level 3 Programmer Functions; Maintenance / Inspection; Inspection / Testing; Daily Attention - Honeywell MORLEY IAS DX Series User Manual

Table of Contents

Advertisement

Dimension Series

9 Level 3 Programmer Functions

Refer to the Product Manual (996-147) for complete information on installation, commissioning and
programming the DX1e, DX2e and DX4e Fire Alarm Control Panels.

10 Maintenance / Inspection

BS5839-1: 2002
!
BS5839
Clauses 45 & 47
Inspection, Service and
User Responsibilities.
In accordance with best practice, the Responsible Person should maintain a logbook to record all
events resulting from or affecting the system. The logbook should be kept in a place accessible to
authorized persons (preferably near the main panel).
All events should be properly recorded (events include real and false fire alarms, faults, pre-alarm
warnings, tests, temporary disconnection's and service visits). A brief note of any work carried out or
outstanding should be made.

10.1 Inspection / Testing

It is recommended that the Responsible Person undertake the following test schedule.

10.1.1 Daily Attention

Check the following:
1.
The panel should indicate normal operation & if not the fault should be recorded in a logbook & reported
to the servicing organization.
2.
Any faults previously reported have received attention.

10.1.2 Weekly Attention

Check the following:
1.
Every week, at approximately the same time each week, a manual call point should be operated during
normal working hours. Check that the system responds to the fire alarm and turns on appropriate alarm
outputs. Where permissible, any link to the fire brigade or remote manned centre should also be operated.
2.
A different manual call point shall be used each week so that ALL manual call points are exercised in
rotation.

10.1.3 Monthly Attention

Check the following:
1.
Any stand-by generators should be started and fuel levels checked.
User Manual
The Equipment Owner shall ensure that a periodic Inspection
and Servicing Maintenance Schedule be followed. The
implementation of a maintenance contract with a 3
approved Fire Alarm Service and Maintenance Company is
recommended.
The aim is to provide a complete check and test of the entire
fire alarm system within a 12-month period.
The Equipment Owner shall appoint a single, named
Responsible Person to oversee all aspects related to the fire
alarm system, including record keeping, testing and false alarm
management. Refer to the standard for a complete list of the
Responsible Person's recommended duties.