Small cabinet pad mount frame

Advertisement

ADCP-96-123 • Issue 1 • May 2007
Install the cable conduit from below and position it so that the top of each upward bend will be
located within the PMF opening at the indicated point. When installed, the top of the conduit
should be located 1 to 2 inches (2.54 to 5.08 cm) below the top of the finished concrete pad.
Install the conduit before pouring the pad.
GROUND ROD
(LOCATE 1 - 2 INCHES
BELOW TOP OF PAD)
PAD MOUNT FRAME
CAST IN PLACE
REINFORCED
CONCRETE PAD
6.0 IN.
(15.2 CM)
4.0 IN. MIN.
(10.2 CM)
Page 4
© 2007, ADC Telecommunications, Inc.
36.8 IN.
(93.5 CM)
4 IN. DUCT FOR
FEEDER CABLE
(LOCATE 1 - 2 INCHES
BELOW TOP OF PAD)
DO NOT POUR
CONCRETE INSIDE
PAD MOUNT FRAME
CABINET FRONT
TOPSOIL OR
DECORATIVE ROCK
GRAVEL OR EQUIVALANT FILL
COMPACTED SOIL
Figure 2. Constructing the Concrete Pad for the FDH 3000 Small Size Cabinet
17.5 IN.
(44.5 CM)
12.5 IN
(31.8 CM)
8.0 IN.
(20.3 CM)
(20.3 CM)
DISTRIBUTION CABLE
(LOCATE 1 - 2 INCHES
18.0 IN.
(45.7 CM)
TOP OF PMF SHOULD BE
FLUSH WITH TOP OF CONCRETE
8.0 IN.
11.75 IN.
(29.8 CM)
4 IN. DUCT FOR
BELOW TOP OF PAD)
38.6 IN.
(97.9 CM)
GRADE
90º BEND
IN DUCT
21936-A